https://www.facebook.com/media/set/?set=a.351341654910092.83161.277333568977568&type=1
But here are a few highlights:
Craning the counter weights into a stack which is then added
to the back of the crane. If you look closely, you can see that there
are already two weights mounted on the back of the crane.
Sling lift fully assembled and cables ready to be threaded
through the floor joist of the box.
Threading the cables through pre-drilled holes in the floor joist.
In the background is Box #2. The crane is repositioned to thread
the sling cables through the floor joist.
Box #2 is set, and winched into place. All told, the variance between
Boxes #1 & #2 and the foundation was less than 1/8".
Hinged roof being deployed.
Box #3 ready for lifting.
These guys really know how to raise a roof!
By early Friday afternoon the house is completely "dried in."
Which means the interior, roof, and insulation are protected from
the elements. The house can be secured by lock and key -
no fixtures, cabinetry or plumbing is left vulnerable to theft,
vandalism, or damage from the elements.
Check back tomorrow for interior photos. Video clips of the set will be available soon on our YouTube Channel.


Wow! This is getting me very excited to build ours!
ReplyDeleteIt looks great! It really is an amazing process! So excited!
ReplyDelete